Buying a house is something relatively easy to do. Anyone with some money in the bank and a good credit score can do that.

Building one is entirely a different story.

Building a house from scratch is an endurance game. It requires passion, vision and, in most cases, a real necessity.

A-frame houses are relatively easy to build if you buy a construction kit. However, the process requires commitment and good skills.

In this article, I want to make it very simple for you and put in your hands a list of practical steps to follow to make your house happen.

1. Know what you need

The first step would be to pick a model and start to plan with that in mind.
Unfortunately, it is not possible to pick a model if you do not have a crystal clear idea of what you want to do with it and what you need it for.

We stress a lot on the need to create your own vision first. We mean it… that’s how you should start.

2. Pick a model and set a figure

Once you know what you want to build, pick a house kit model.
Note we do not recommend to build the house from scratch (that’d be a suicidal mission). You need to start with a ready-made solution, a house kit, which has been designed and tested.
A home kit comes with no surprises.

If you use one of our kits, you can pick your model andget a quote.

How To Build an A-frame House Step-By-Step - AVRAME Kit Homes (1)

The number you get is for the house kit only and, usually, you need to account double that number to get the house finished.
NB: to this number you have to add the cost of the land.

This is just to give you a ballpark figure of the budget you need to have in order to pull this off.

Before you start the project you’ll need to get into the fine details of the budget and account for everything you are gonna have to buy to finish up the house (more about this in a moment).

3. Can you afford it?

Based on the number you got at step 2, make a quick reality check and see if you can afford to build.
If you don’t, not all hope is lost. You can park this idea for a few years and come back to it once your financial situation gets better or choose a smaller model.

4. Pick a land

Needless to say, to build a house you need a piece of land.
If you have it already, good. If you don’t, now it is time to go looking for one. See the next points for tips on what to keep in mind.

5. Download drawings

Get thedrawingsfor the particular model you chose and print them out.
You’ll need them in the next step when you go seek for preliminary approval.

How To Build an A-frame House Step-By-Step - AVRAME Kit Homes (2)

6. Get a preliminary approval

To build a house you need permission from the Municipality.
It is a good idea to get a preliminary permission BEFORE you make any other move.

If you own a land already, you want to make sure you can build an A-frame house on it.

Despite being a very old type of construction, A-frame houses are seen sometimes as a novelty and they are not welcomed by approval authorities.

One of the biggest obstacles to approval is the slope fo the roof. Make sure your municipality is fine with it and that they are ready to give you approval on the particular piece of land you own.

If you do not own any land yet, you have the luxury to iterate the process until you find a location where they allow you to build your dream home.

Countryside locations tend to have less constrains in terms of what one can build.

7. Plan everything in detail

If you get this far you are in the 1% of people who stand by their desires and take action to shape their reality.

Congratulations!

At this point, you need to start planning the works, get a clear idea of all the material and services you need to order and how much it will all cost.

To help you with this, we have two guides:

  • the100 Questions Guide(44 pages), which deals with the mindset of building a home from scratch and teaches you 100+ important things you should pay attention to.
  • theBudgeting Guide(30 pages + spreadsheet), which helps you to figure out the total cost for your build.

Both guides are useful tools that can be used to build any type of house (not just A-frames).

Do not be overwhelmed by the homework you have to do in this step. It is totally feasible and we are willing to help.

8. Get your finances straight

With the full budget you prepared, go meet your bank and secure a loan for the construction.

In case you don’t need one… congratulations, you can jump to the next step.

Note that banks appreciate details and they’ll love the budget you’ll prepare using our budgeting guide.

Also, the more detailed the budget, the fewer surprises you’ll have to face during construction.

9. Order the kit

Time to order the house kit and to book all the other services you’ll need to finish up the house.

If you wonder what those other services would be, the100 Questions Guideis a good place to start to shed clarity on that.

10. Build the foundation

The foundation must be ready before the kit arrives on your property.

How To Build an A-frame House Step-By-Step - AVRAME Kit Homes (3)

You need to prepare the property of the works, to arrange groundworks and build the foundation properly.

You can find some tips inthis article.

11. Assemble the structure

Once you get the kit, you need to put it together on the foundation you already built.

How To Build an A-frame House Step-By-Step - AVRAME Kit Homes (4)

The assembly work can be done by you and your family (or friends) or by local carpenters.
A combination of both will also work. Ultimately it is up to you how to set up this phase of the work.

12. Make it weathertight

Getting the house weatherproof is your number one priority at this point.

With the kit, you’ll get the windproofing membrane, the roof cover, the windows. With those components you can quickly close the house, so you can start working “indoor”.

How To Build an A-frame House Step-By-Step - AVRAME Kit Homes (5)

13. Install the insulation

Then next thing you want to do is to install the insulation material in the roof and in the front and back walls.

Insulation takes a lot of space. For this reason, it is not delivered with the kit. You have to source it locally.

Insulation shall be installed properly since it has the important function to keep your house warm. There is no room for error here.

14. Install the air-tight layer

The insulation needs to be protected from the inside with a vapor membrane that shields the insulation material from the humid indoor air.

Failure to shield the insulation properly will cause vapor to penetrate into the insulation and to condensate.
Wet insulation loses its thermal properties and, over time, it will rot and generate mold.

Getting the house air-tight is a must.
You should plan to make a door-blower test to check how air-tight you managed to make it.

15. Finish the exterior

Once the “urgent works” are done, you can close up the facade and eaves and give to the house its final exterior look.

How To Build an A-frame House Step-By-Step - AVRAME Kit Homes (6)

16. Technical installations

Next, you can now start working inside. It is time to take care of:

  • electricity
  • plumbing
  • ventilation
  • heating
  • eventual fireplace or stove

Some of these technical installations need special licenses to be put together. You should check with your municipality on what you are allowed to do yourself and what you must contract to a specialized company.

In any case, those things should be planned well in advance and budgeted to the finest detail.

17. Finish the interiors

Interior finish works are very time-consuming. Plan to spend here most of the time for the construction of the house.

Interior finishing works include:

  • closing up everything with wooden boards (or gypsum boards if that’s your wish)
  • installing stairs
  • installing flooring material
  • installing window and floor trims
  • painting the interiors
  • tiling the bathroom and the kitchen
  • installing bathroom-ware
  • installing kitchen-ware

18. Furnish it up

When you get here, most of the work is done.

It is time to give some personality to your new home.

Buy the stuff you want to have inside and turn the empty space into a cozy nest for your family.

19. Clean up the site

No, you are not done yet.
Outside everything is a mess. You need to clean it up.

Wood scraps, board cuts, wiring, stones…

It usually takes more than one season to clean the site properly… unless you order this as a service.

20. Landscaping works

Once the house is done and the property is cleaned up, you should still have some space in your budget to plant some trees and make your piece of land look like a small paradise.

Conclusions

Congratulations!
You made it to the very end of this article and you should now have a better picture of all the steps you need to taketo build an A-frame house… or any kind of kit home for that matter.

It is a lot of work and there are a lot of details you should not overlook.

Building a house from scratch is not something you can do without preparation… so make sure you allocate enough time to get proper knowledge.

To learn and try out DIY building, we have released detailed drawings of our smallest house Solo Hobby. It includes list of all materials and tools it is needed to build this house. It is available in our E-store. The link to that can be foundhere.

How To Build an A-frame House Step-By-Step - AVRAME Kit Homes (2024)

References

Top Articles
Latest Posts
Article information

Author: Domingo Moore

Last Updated:

Views: 6135

Rating: 4.2 / 5 (53 voted)

Reviews: 84% of readers found this page helpful

Author information

Name: Domingo Moore

Birthday: 1997-05-20

Address: 6485 Kohler Route, Antonioton, VT 77375-0299

Phone: +3213869077934

Job: Sales Analyst

Hobby: Kayaking, Roller skating, Cabaret, Rugby, Homebrewing, Creative writing, amateur radio

Introduction: My name is Domingo Moore, I am a attractive, gorgeous, funny, jolly, spotless, nice, fantastic person who loves writing and wants to share my knowledge and understanding with you.